Summerland Point, New build — slab, driveway & pool surround2026

Summerland Point

“Another one in the ground. First pour at our Summerland Point project all wrapped up.” Two reels from the same job, a week apart: the prep day with the excavator and the pool shell already in, then the pour itself — from the truck backing in to the last trowel pass. This is what a job looks like before there's anything pretty to photograph, and it's where the quality is actually decided.

Scope

  • New build — Summerland Point, Lake Macquarie
  • Excavation, formwork and pool-surround set-out
  • Boom-pumped pour, screeded and machine-floated
  • Driveway and pool surround to follow
Trowelling the first pour at Summerland Point
Excavator on day one of prep at Summerland Point
Cameron on site at the Summerland Point pour
Cameron on day one at Summerland Point

From our Instagram

Filmed on site, as it happened.

East Edge film the job as it goes in — this is his own reel from this one.